This refurbishment project at Hyde Park Corner consists of converting the lower ground floor into a brand new Spa. The project consists of new ventilation installation inclusive of air handling units and extract fans. Working Environments are re-using the existing heating system serving the installation of new fan coil units throughout the Spa, which are also fed via a chilled water supply from the newly installed chiller units located within the loading bay.
The Spa is being provided with new sanitaryware and new domestic water services via the hydropool plantroom. Within the plantroom a new cold water storage tank and booster set will be located providing fresh water to the Spa. The loading bay is being refurbished to contain the main plantroom, housing the chillers and hot water cylinders, the high level gantry is also being extended. The loading bay is the new location for their staff accommodation area and the new employees of the Spa.