Time Square, Bracknell

The refurbishment of a five storey building and separate single storey office for a Local Authority.  The works were carried out in multiple phases, ten phases for the main office building and one phase for the separate building.

Mechanically the works included a new four pipe chilled water system on each floor along with modifications to the primary ventilation system and new secondary ductwork.  The works also included modifications to the BMS system as well as modifications to the existing cold water and above ground drainage system.

Refurbishment of the basement boiler room, installation of new boilers and water heater with modifications to the controls system.

Electrically the works included a new lighting system, new power distribution circuits, new data installation and the modifications to the existing fire alarm, security and access control systems.

Time Square - Main Image

Project Stats

END CLIENT:
Bracknell Forest Borough Council

TOTAL VALUE:
£2,010,699

SERVICES:
MECHANICAL and ELECTRICAL Services

DESIGN:
Pre-designed by Ridge

PROGRAMME:
52 WEEKS